Heavy Metal Design Ltd. logo

Once the project model has been developed in Tekla Structures we can then create:

  • Erection Diagrams (GA Drawings)
  • Shop Drawings (Assembly Drawings)
  • Single Part Drawings
  • Drawing List Report (Drawing Log)
  • Bolt List Report (For field and shop bolts)
  • CNC/NC1 and DXF files
  • KISS/EJE files
  • In the process of developing the model we also handle RFI management complete with a tracking log.
    This is part of our quality control system to ensure that a project goes through the shop and the field with a minimum of disruptions.